|
C2F Model
The C2F model stands for "Customer to Factory," meaning a direct connection between the consumer and the factory.
1. Direct Connection, Fewer Intermediaries
Eliminates middlemen like wholesalers and retailers from the traditional model, allowing you to enjoy high-quality products and services at lower prices.
2. Customized Service to Meet Your Personal Needs
Under the C2F model, you can personalize products based on your preferences and needs.
3. Higher Efficiency, Better Service
Reduces communication steps, ensuring that every response is prompt and every issue is addressed efficiently, providing timely feedback handling.
|
|
|
One-stop home solutions
One-stop Home Solutions
1. Save Time
From design to construction, customization, and furniture, we handle it all, saving you valuable time.
2. Save Effort
No need to run around for different processes. We offer comprehensive services, allowing you to enjoy a healthy living environment effortlessly.
3. Save Worries
Our professional team tailors every detail just for you, ensuring you no longer have to worry about your home.
4. Save Trouble
A one-stop solution that covers design, construction, customization, and furniture, eliminating tedious processes.
5. Save Money
By integrating multiple resources and optimizing cost structures, we provide you with high-value, cost-effective home services.
|
|
|
|
|
Environmental System
Environmental protection system
Water: With top-tier water filtration systems, we ensure that every drop of water is pure and safe, protecting your family's drinking health.
Airflow: Scientifically designed ventilation solutions create a "breathing" home, making it a true sanctuary from the outside world.
Air: We carefully select high-quality materials to significantly reduce harmful substances in indoor air, ensuring that every breath you take feels as fresh as being in nature.
Light: By skillfully combining natural light and artificial illumination, we design a cozy and bright living environment based on room layouts and living needs.
Sound: We use high-performance soundproofing materials to optimize the indoor acoustic environment, effectively blocking out external noise and creating a peaceful haven for your family.
|
|
|
6 Major Testing & 36 Environmental Protection
|
|
Doors, Windows, and Electromechanical Installation: |
Extruded polystyrene board for floor heating installation
Glue for securing air conditioner insulation
Glue for connecting fresh air ducts
Glue for sealing/edge trimming windows
Glue for sealing/edge trimming security doors
Glue for sealing window sills
|
|
|
|
Foundation Construction: |
Protective primer for finished products
Installation of electrical circuits and conduits
Glue for installing aluminum ceiling tiles
Leveling with plaster/wall lining
Waterproof & adhesive for tiling
Wall paint application
|
|
|
|
Wallpaper and Flooring Installation: |
Glue for wallpaper installation
Glue for securing floor edge strips
|
|
|
|
Custom Furniture Installation: |
Installing cabinets, bathroom vanities, wall panels, bedroom cabinets, tatami beds, living room cabinets, bookshelves, hallway cabinets, and interior doors.
|
|
|
|
Finished Furniture & Soft Furnishings Installation: |
Bed installation
Coffee table installation
Bedside table installation
Dining table & chair installation
Desk & cabinet installation
Curtain installation
|
|
|
|
Sanitary Fixtures Installation: |
Glue for shower room installation
Glue for basin installation
Glue for toilet installation
Glue for bathtub installation
Edge sealing glue
Installation of certain hardware components
|
|
|
|
|
|
|
|
Environmental Standards Comparison
According to the GB/T18883 standard issued by the National Health Commission, our process ensures whole-home, all-phase, highest-standard environmental control to dispel misconceptions and create a truly healthy living environment.
|
GB/T18883 Standard |
Issued by: National Health Commission
Purpose: Healthy living environment standard / National recommended environmental standard
Testing Procedure: Seal the space for 12 hours before testing
Application: Ensures air quality meets health standards at the time of move-in
|
|
|
|
GB50325 Standard |
Issued by: Ministry of Housing and Urban-Rural Development
Purpose: Residential construction project / Mandatory acceptance standard
Testing Procedure: Seal the space for 1 hour before testing
Application: Ensures air quality standards are met before handover of the property
|
|
|
|
|
|
5 Key Phases and 36 Project Milestones
|
|
01. Pre-Construction Preparation |
Project initiation meeting
Development of construction schedule
Completion of property management procedures
Site protection and material delivery
On-site blueprint marking
Kick-off ceremony
Room-by-room handover and briefing
Product and utility handover
Inspection and acceptance of construction materials
|
|
|
|
02. Concealed Construction Phase |
Structural modification
Installation of water and electrical systems
Acceptance of structural modifications
Inspection of water, electrical, and waterproofing systems
Payment of second construction installment
Designer assistance with secondary blueprint marking
|
|
|
|
03 Mid-Construction Phase |
Full-scale carpentry and masonry work
On-site project meeting
Measurements for customized products and coordination
Secondary review and supervision of construction and product progress
Quality and process inspection of construction work
Review of the "Mid-Phase Addendum List"
Preparation of the "Mid-Phase Budget Adjustment Document"
Payment of third construction installment
|
|
|
|
04 Post-Construction Phase |
Quality control and supervision of construction work
Progress monitoring and supervision of project milestones
Control of product installation progress and inspection at various stages
Full-scale painting and finishing work
On-site project meeting
Final quality inspection of the project
Preparation of the "Final Settlement Document"
Payment of the final construction balance
|
|
|
|
05 Installation and After-Sales Service Phase |
Product debugging and segmented acceptance checks
On-site staging of decorative items
Delivery of the "Product and Equipment User Manual"
Commencement of the warranty period upon project completion
|
|
|
|
|
|
|
|
SkyEye Monitoring System
01. Remote Cloud Monitoring: Peace of Mind for Your Home
Monitor the construction site anytime, anywhere.
Stay connected with the on-site progress, ensuring transparency and enhancing the renovation experience.
Achieve multi-party supervision to guarantee quality delivery.
02. Real-Time Updates on Progress and Site Conditions
Unlike traditional monitoring, the SkyEye system automatically identifies site conditions and generates data reports.
Real-time monitoring of improper site behavior with automated notifications and reports.
03. Instant Voice Communication: Fast and Convenient
Speak directly to on-site workers via the monitoring system, eliminating intermediary steps for efficient communication.
04. Adjustable Camera Angles for a Comprehensive View
Easily adjust camera angles online to gain a complete and detailed view of the site.
|
|
|
|
|
|